Landsvirkjun is expanding the Búrfell Hydropower Station by 100 MW.  The project includes the construction of a 370 m long headrace canal, intake structure, 110 m high vertical pressure shaft, an underground powerhouse for a 100 MW Francis turbine, 450 m long tailrace tunnel and a 2.2 km long tailrace canal.  Design discharge is 92 m3/s.  The work includes direction of site supervision and expert services.

Hydropower
Project type
Iceland
Location
100 MW
Capacity
2016-
Ongoing